Part one: special specification of Technology
Features 1.Rapidly locate fault points and fault liability;
Features ll. lmmediately report the nature of the fault - ground and phase short-circuit;
Features Ill.Inter-day resection (isolation) or recovery failure ---- Reducing the scope offaults and ensuring superior switching normal operation;
Features four, intelligent design:(integrated circuit breaker and load switch in one, and remotemonitoring users load);
The load switch developed by our company is based on the circuit breaker body,which is thedesign of the circuit breaker.Metering and manufacturing concepts,production costs of circuitbreakers, complete sets of equipment intelligence.Features Five, zero-sequence currenttransformer three-phase one Physical design:
1.Break through the narrow design limitations of the built-in space;
2.Solve the problem of taking into account the measurement accuracy of low current and highcurrent values;
3.Adopt integrated structural casting solution to solve the problem of built-in installation ofzero-sequence CT phase CT;
4.Measurement range from 0.2A to 600A(guaranteed low-end 0.2 ~ 5A) accuracy of ± 3%;5. Integrated current transformers for high performance design and manufacturing.Features six,flexible in and out of line:
1.Fully insulated cable outlet can be adopted,120mm2 and 240mm2 size can be selected;2.The standard product can be equipped with a unique outdoor insulation protection cover to distinguish the phase sequence and dust,rain, anti-aging, anti-corrosionErosion and other features can ensure that the product operates safely in a variety of outdoor harshenvironments.
The main features introduced:
1 , zero sequence protection function
When a ground fault occurs in the branch line user and the end user line, the
d e marcation breaker controller detects the zero-sequence current.After the delay is determined to be a permanent fault, the controller outputs the opening commandto automatically divide the demarcation vacuum breaker and automatically cutln addition to ground faults, other users in substations and feeders do not experience theoccurrence of faults.
2 , quick-break protection
Short-circuit currents are detected by the demarcation breaker controller when a short-circuitfault occurs in the branch line users and the end-user line.
The controller immediately outputs the opening command so that the demarcated vacuumcircuit breaker automatically opens,automatically removes the short circuit fault, substation andfeedOther users on the line are protected from power outages.
3, over-current protection
When an over-current fault occurs in the branch line user and the end-user line, the
demarcation breaker controller detects the over-current.After the time delay is determined, thecontroller outputs the opening command to automatically divide the demarcated vacuum circuitbreaker and automatically remove the overcurrent fault.Substations and other users on feedersavoid blackouts.
4, reclosing function
ln order to prevent the user from power failure for a long time due to a transient fault, after theprotection action of the controller, the circuit breaker
Line reclosing, reclosing times, time can be set, reclosing up to 3 times.5、Acceleration after reclosing
ln order to avoid permanent damage to the line caused serious damage, or other protection ofthe time limit, the controller does
Acceleration protection after reclosing.6 , quickly locate fault liability
After the user of the branch line user and the end user of the line demarcate the vacuum circuitbreaker protection action, only the responsible user is powered off, and the user
After unsolicited reporting of fault information, the power department can quickly determine thefault point and immediately go to the fault site to troubleshoot the fault; such as demarcationThe circuit breaker controller is equipped with a communication module,and the information isautomatically reported to the power management center, avoiding long-term fault checking.Inquiries and issues related to the responsibility of the power sector and users.
7 , monitor user information
The demarcation breaker controller can be equipped with wired or wireless communicationmodules to transmit monitoring data to the power management center.
Realize remote real-time data monitoring of user information, truly achieve "four remote' functionsand automatic reporting of faults to the Ministry of Supervision door.
8, a wide range of applications
The complete set of equipment is suitable for ungrounded neutral points, neutral arc-extinguishing ring grounded or neutral grounded by small resistance 10kv or 6kv distribution network system.
9 , flexible outlet
Outlet can use silicone rubber sleeve,can also be equipped with fully insulated outlet cable.10, switching power supply flexibility
Switching powersupply can choose large-capacity externalTV (primary with a fusion tube),can also be configured with integrated Tv.
The second part of product technical parameters
2.1 , Standards and Specifications
2.1.1 Contracted equipment in accordance with relevant standards,specifications or guidelines, including all accessories for purchase from other manufacturers And equipment, shouldmeet the requirements of these standards,norms or guidelines.
2.1.2 The clauses in the following table of standards are used as references to thisspecification by reference to this specification,and are dated
Reference standards, the subsequent all amendments (excluding errata content) or revisions do notapply to this specification.Where lt is an undated reference document.The latest version applies tothis specification.
2.1.3 relevant specifications:
State Grid Corporation "Eighteen Requirements for Prevention of Major Electricity PowerAccidents"State Grid Corporation lmplements Cross-Regional Power Grid Construction andlmplementation Measures for 18 Measures to Prevent Accidents(Trial) Particulars on the "anti-measures" of relay protection and implementation rules of the power company State GridCorporation of Other Enterprise Standards
2.1.4 All bolts,studs, threads, pipe threads, bolt heads, and nuts comply with lSO and slmetric standards.
2.1.5 When there is a difference between standards and specifications, they are performedaccording to the requirements of high standards.
Service commitment
First, after-sales service
(1)Free pre-sale services lf necessary,send technical personnel to the site to carry out thesurvey before the product contract is fulfilled.And cooperate with your technical staff to provideproduct technical disclosure and clarification.
(2) When the product is delivered, send technical personnel to the site to perform follow-upservice and assist you in the inventory and inspection of the goods.
Test and provide product technical information according to your requirements.
(3) Free instruction installation and personnel training During the product installation, we sendexperienced and competent technical personnel to the site.Guide the installation and train yourengineering technicians and operators.
(4) Free commissioning After the installation of the product, dispatch personnel to performpower debugging.
(5) Free onsite on-site operation In the initial stage of product power-on operation,personnelare dispatched to aperate on site.
(6)Free maintenance during the warranty period The quality problems that occur during theproduct warranty period will be met by our company.Investigate the cause and replace the damagedproduct and parts for free.
(7) Our company timely provided equipment supervision,inspection,commissioning.acceptance and performance acceptance tests related to contract equipment.Operation,maintenance and other corresponding technical guidance, technical cooperation, technical trainingand other full-service.
8)Our company is obligated to invite you to participate in the technical design of our companywhen necessary, and to explain the technical design to you.In the event of major problems requiringthe parties to immediately study and negotiate, either party may propose to hold a meeting.Undernormal circumstances,The other party should agree to participate.
(9) Our company has a special service organization to provide your company with after-salesservice and maintenance. After the equipment is installed, it enters During the normal use phase,our company will pay a regular free return visit. The company will conduct regular inspectionsduring the warranty period.During the warranty periodThe quantity problem, after receiving yourletter and electricity, our company will propose a solution within 2 hours and send it within 24hours.People go to the scene to handle the implementation of three packs of services, warrantyperiod only charges cost.
(10) Spare parts will be provided free of charge during the warranty period.After the warrantyperiod expires, high-quality spare parts will be preferentially supplied to demanders.
(11) Damage or potential shortage of supply equipment lor components) due to negligence ofour company during the warranty period Trap, and use spare parts in your company's inventory toreplace damaged equipment or parts,then our company is responsible for freeSpare parts andspare parts for use shall be shipped to thelocation designated by your company within no more thanhalf a month at the latest.
(12) Our company will arrange one (can increase if necessary to meet the project needs)experienced service personnelResponsible for the after-sales service of your project to ensure thecorrect installation of the contract equipment and the successful completion of the project.
User demarcation controller (commonly known as "watchdog")
※ Before the controller is put into operation, please read this manual carefully!
user's Guide
1Overview
Main use and application scope
When a 10kV overhead distribution line T is connected to a user inside a fault, if the fault is onthe incoming line, or the fault occurs,
When the user enters the line switch, but the time limit of its protection action is not properlymatched with the substation outlet switch protection, it will cause changes.The power stationoutlet switch protects the gate. If the nature of the fault is permanent and the substation reclosingfails, a medium voltage user The accidents in the sector will cause the entire distribution line to bepowered off. This type of common accident in the distribution network will cause harm tosociety.Bad influence.The user demarcation switch is the ideal equipment to solve the abovecontroversy accidents, the responsibility of the equipment installed in the 10kv overheaddistribution line At the demarcation point, it is possible to automatically cut off single-phase groundfaults and automatically isolate phase-to-phase short-circuit faults. Ensure non-failed userElectricity safety.
The FDR-2 user demarcation switch controller is specifically designed for intelligent control ofthe demarcation switch body.Realize protection control Functional and communication functions,the controller and the switch body are electrically connected through a control cable and an aviationconnector to realize Protection and automatic monitoring.This product is widely used in urban andrural 10kV overhead distribution line users.The appearance is shown in Figure 1.
Use environmental conditions
a)Altitude: ≤2000 meters
b)Ambient temperature: Outdoor -40C ~ +80° C
The highest annualaverage temperature of 20° C.The highest daily average temperature of 30° C
c)Anti-seismic capability: Horizontal ground acceleration 0.3g.Vertical acceleration 0.15g.
Continuously acting for three sine waves.Safety factor 1.67
d) Maximum daily temperature difference: 25° C
e) Sunshine intensity: 0.1W/cm2 (wind speed 0.5m/s)f)Maximum wind speed: ≤25m/s
g) Maximum ice thickness: 10mm
h)Operating environment: outdoor, non-flammable, explosion hazard,chemical corrosion, andsevere vibration
i) Neutral grounding method: neutral point is not grounded, neutral point is arc-extinguishing coilgrounded,and neutral point is grounded by low resistance.
Product quality responsibility
Before the controller is put into operation, please read this manual carefully.We will not damagethe equipment caused by the violation of the operation.
Take responsibility.
Technical Parameters
Switch body needs to provide technical parameters (see Table 1 )
Matched switches need to provide parameters
Functions and features
Controller functions
◇Swift protection ◇Overcurrent protection ◇Three times reclosing ◇Event record ◇Inrushprotection
◇Zero sequence protection ◇Real-time clock ◇ Acceleration after reclosing ◇Real-timestatus query Smart handheld control
◇Local/Remote Settings ◇GPRS Communication Controller features
◇Can carry 485/232 communication interface, or realize long-distance monitoring throughoptic fibre, wireless; Accelerate function after reclosing:
When the switch coincides with a permanent fault, it automatically accelerates tripping;
◇Remote/Manual Closing Accelerated tripping and latch reclosing:After the user has checkedand repaired the line,if the user forgets to remove the connection.
Ground switch should accelerate tripping;
◇Three times of reclosing delay time can be adjusted; ◇tripping and closing circuit adoptsanti-misoperation design and has anti-jump function;
◇Zero-sequence current can distinguish between faults in the area and outside the area;◇Remote-control switch-off and closing is designed to prevent misoperation.Structural features
a) The controller is a microcomputer type relay protection and monitoring device;
b)The controller has the characteristics of strong weather resistance and anti-condensationprotection;
c)Connected to the switch body through the aerial connector, d) The connection reliability isgood and the protection level is high.There are four analog input channels for the controller,A-phase current, C-phase current, zero-sequence current, and BC phase-to-phase voltage.Controller Through the real-time monitoring of the value of the above-mentioned analog value andcompared with the fixed value to determine the line fault, so as to carry out corresponding processing.under The table shows the fault handling results of different systems.
lnstallation and connection
Column installation diagram
The demarcation switch body and the controller are installed on the same rod, and theconnection is schematically shown in Figure 2:
The nearest remote control method:
Bkey: unlock key; A key: break key; D key: closing key;
When remote control operation, press B key for 1 second, then press function key within 3seconds;For example, when the opening operation is performed, first press the B button for 1second,then press the A button within 3 seconds;
During the closing operation, press the B button for 1 second and then press the D buttonwithin 3 seconds.PDA smart handheld function description
Search equipment Select ‘Search for device' option, PDA will search within thecommunication range iless than 150 meters in distance)
lf there is a controller in the search scope,select the device number of the correspondingcontroller and enter the master that displays the selected device number.Interface window.
Query status
Select 'Query Status' to display the current controller's real-time status value.
Query the records
Select ‘Query Record’to display the last 30 fault records that occurred in the past;
Remote operation
Select the 'Remote Control' window to display the selection screen.
Select'Switch’to remotely control the corresponding device number to perform a closingoperation;
Select 'Switch Points' to remotely control the controller of the corresponding device number toperform a switch-off operation;
Modify the value
Select 'Modify' to modify all settings parameters of the controller.
Device reset
Device reset' allows remote control of the FDR-2GP controller for reset operation.
Transport, acceptance and storage transport When transporting, the switch body and controller must be installed in a closed box to befixed.
acceptance
7.2.1 Check the controller package for damage.
7.2.2 Control Product Packing List Check whether the file is complete, accessories and spareparts are complete.
7.2.3 Check whether the technical parameters on the nameplate meet the order requirements.Storage
This controller should be stored in a dry, ventilated, moisture-proof, shockproof and anti-harmful gas intrusion chamber, long-term storage should be Check regularly if the environment meets the requirements.Packing, unpacking and storageshould be in a dry room, to enter the product and its components Check whether the check is complete and consistent.The product body overlap height is notmore than 3 layers.
Operation and Maintenance
The equipment has undergone rigorous factory testing at the factory. lf any abnormality is foundduring use, please record the factory settings of the equipment.
Numberand abnormal matters,and immediately contact with our company.Special Note: Do not disassemble, modify or repair the equipment.
In the use of the equipment, it is assumed that the possible faults are as follows.ln the event ofan accident, if the switch malfunctions, etc..
The following processing methods are provided for reference when using.